DESIGN AND CONSULTANCY SERVICES

  1. FOOD SERVICES AND LAUNDRY
     
    1. Conceptual Development and Preliminary Designing
      • Preliminary Design - Budgetary Estimation of Project Cost
      • Floor Space Requirements
      • Internal Finishes and Illumination Requirements
      • Noise Pollution Control Requirements
      • Floor Strength and Loading Requirements
      • Floor Water Proofing Requirements
      • Hygiene Requirements
      • Ventilation, Exhaust and Heat Extraction Requirements
      • Flow of materials, work flow, manpower requirements, time and motion study, primary and secondary process technique, ergonomics and motion economy.
      • Storage requirements for Dry and Refrigerated Raw Materials
      • Material handling, storage and service of finished products.
         
    2. Final Design and Layout Planning
      • Equipment sizing and capacity requirements
      • Equipment selection
      • M &E Schedule of selected equipment
      • Life expectancy projections of selected equipment
      • Itemized Project Budgeting

              c.   Tender Documentation

  • Manufacturers catalogues and technical Data Sheets
  • Preparation of detailed Technical Cut Sheet file and Elevations Drawings for custom fabricated equipment
  • Hardware documentation for all fittings and fixtures required in custom fabricated items
  • General specifications
  • Bill of quantities and Summary of pricing
  • Day schedule of Labour rates
  • Schedule of rates for materials
  • Maintenance Contract Format
  • Warranties
  • Form of Tender
  • Tender Drawings and other Instruments of Definition

 

              d.   Tender Evaluation
  • Bid Evaluation
  • Technical Evaluation
  • Value engineering
  • Final recommendation of award

              e.     Post Award Services

  • Checking and approval of contractor's Fabrication drawings
  • Pre-delivery inspections
  • Site Progress Supervision
  • Installation inspection and evaluation
  • Final Equipment audit and operators staff training
  • Checking and approval of Contractor's As-built drawings
  • Accessories and essential spare-parts Audit
  • Final Inspection and Hand over checks
   2.  WASTE MANAGEMENT
  • Estimates of Solid and Liquid waste for all related operational areas
  • Sizing, selection and specification of waste handling and grease separation equipment
  • Optimum solutions for specified waste problems related to project
  • Hygiene and Environmental considerations in view of statutory and social requirements
  • Implementation including operating procedures for waste handling systems
  • Operator's staff training and orientation





















© Copyright 2002. www.par-synergy.com